Construction Scope
Procurement, installation, and commissioning of air compressors, cooling towers, fans, and water pumps.
Design and construction of pipelines for compressed air, mixed gases, oxygen, nitrogen, and helium in the workshop.
Inspection procedures for pipelines.
Pressure testing and cleaning of pipelines
As-built drawings
Centrifuges (110 cubic meters, 3 units);
Oil-free screw compressors (40 cubic meters, 3 units);
Compressed heat zero-air-consumption adsorption dryer(6 units)
Water pumps (37 kW, 3 units);
Water tank (60 cubic meters, 1 unit);
Cooling tower (500 cubic meters, 1 unit);
Centralized control system (3 high-voltage cabinets, 1 frequency converter cabinet, 6 low-voltage cabinets);
Station building hoisting system (1 set).