Wechat

Back to Top

EPC Case- HEBEI TIANZHU IRON AND STEEL GROUP

●Construction Scope:

●Procurement, installation, and commissioning for a complete set of  compressor.

●Design and construction of compressed air pipelines in the workshop.

●Inspection procedures for pipelines and pressure vessels.

●Pressure testing and cleaning of pipelines

●As-built drawings

Centrifuges: 400 cubic meters -4 units

Centralized control system, high-pressure cabinets(4 units) low-pressure cabinets, soft start and other post-processing equipment (4sets)

Cooling tower: 1500 cubic meters (1 unit)

Water pumps: 800 cubic meters (4 units)