EPC Case- Bridgestone (Shenyang) Tire Co., Ltd.

Construction Scope:

Procurement, installation, and commissioning for a complete set of  compressor

Design and construction of compressed air and high-pressure nitrogen pipelines in the workshop.

Inspection procedures for pipelines and pressure vessels.

Pressure testing and cleaning of pipelines

As-built drawings

Centrifuges (100 cubic meters each): 3 units;

Oil-free screw compressors (40 cubic meters each): 7 units;

Centralized control system, frequency converters: 7 units; High-voltage cabinet: 3 units;

Heat recovery system: 3 units.